Consolidation and Reconsolidation of Grout

3/9/2022

0 Comments

 
It is our understanding that the current best practices for Central Florida residential subcontractors is to install inspection holes at filled cell locations, and not perform consolidation of grout. Is this allowed by the code?

Also, what is the standard method of determining if all of the cells were completely filled with grout?
MAF Response (Jerry Painter):

The inspection holes are to make sure the base of the CMU cell is clear and that the masonry grout reaches the bottom. The requirement for consolidation and re-consolidation is not forgiven any where in the structural masonry code, TMS 402/602.

Sounding is one way to determine solidity. I feel a lot more comfortable with thermal photography if you can achieve the temperature differential and access to the wall. The MAF has a Structural Masonry Workshop we do 4 times a year. Last year we did 2 in Broward County for their Building Officials, Plans Analysts and others. Maybe we need to do a better job in Central Florida of reaching Code officials.

MAF Response (Don Beers):


I just wanted to concur with Jerry on the requirement for consolidation and reconsolidation in both commercial and residential construction built in accordance with the Florida Building Code.

The code requires a minimum 3"x3" cleanout for all wall over 5'-4" in height but, as Jerry pointed out, this requirement has nothing to do with consolidation of the grout once it is in place. The problem with residential construction is there is usually no inspection on the job during grout placement so the inspector uses the cleanout as a means of determining that the cell was completely filled with grout. Unfortunately, just because the cell is filled at the bottom does not mean that the cell is filled all the way up with no void areas. Careful sounding of all grouted areas of the wall is a standard method of determining whether void areas are present in the cell, however, again as Jerry pointed out, thermal imaging is a more accurate and preferable method.
I would also recommend a review of the delivery tickets for slump and times to determine if a potential problem is obvious. The grout should have been fluid (8" to 11" slump) and placed within 90 minutes of batching. This might help inform you as to the method used to determine whether all cells are completely filled.​
0 Comments



Leave a Reply.

    Authors:

    Picture
    Jerry Painter, FASTM
    352-378-7511
    painterjm@gmail.com 

    Picture
    Don Beers, PE, GC
    561-310-9902
    don@floridamasonry.com

    Categories

    All
    #5 Rebar
    Backer Rod
    Backup Wall
    Bar Hooks
    Block Strength
    Bond Beam
    Bond Breakers
    Brick
    Brick Veneer
    C129
    C90
    Cavity Wall
    Cell Size
    Cell Width
    Cmu
    Code Editions
    Code Requirements
    Codes
    Concrete Block
    Concrete Interlocking Pavers
    Concrete Pavers
    Construction Guidance
    Control Joint
    Control Joints
    Corner Attachments
    Cracking
    Crosswebs
    De-bonded Veneer
    Density
    Design Criteria
    Driveway
    Energy
    Energy Efficiency
    Energy Loss
    Envelope Leakage
    Expansion Joints
    FBC
    FBC 6th Edition
    FBC 7th Edition
    Filling Cells
    Fine Aggregate Grout
    Fire Rating
    Florida Building Code
    F''m
    Grouted Beam
    Grout Height
    Grouting
    Grouting Of Block Walls
    High Strength Masonry
    High-strength Masonry
    High Wind
    High Wind Construction
    HJR
    Horizontal Steel Spacing
    ICC 600
    ICC Code
    Infill
    In-plane
    Insulation
    Integral Waterproofing
    Interlocking Pavers
    Intermediate
    Intersecting Walls
    Job Requirements
    Jobsite
    Joint Reinforcement
    Light-weight
    Masonry
    Masonry Construction
    Masonry Details
    Masonry Insulation
    Masonry Websites
    Masonry Workmanship
    Max Bar Size
    Missile Impact
    Mortar
    Mortar Joints
    Net Area Strength
    Out-of-plane
    Perm
    Pnnl
    Psi
    Rebar
    Reinforcement
    Residential
    R Value
    Safety
    Setting Pavers
    Shear Walls
    Shrinkage
    Slip Joints
    Sound Insulation
    Sound Transmission
    Split-face Block
    STC Rating
    Sticky Stone
    Stucco
    Stucco Bonding
    Stucco Over Lath
    Table 2
    Thin Veneer
    Tie Beams
    TMS
    TMS 402/602
    Tyvek
    UL
    UL Labeling
    Vapor Barrier
    Vertical Steel
    Vertical Walls
    Videos
    Wall Bending
    Wall Design
    Wall Tolerances
    Water Intrusion
    Waterproofing
    Water Vapor
    Wind

    Archives

    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    October 2021
    August 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    October 2020
    September 2020
    August 2020
    July 2020
    May 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018

    RSS Feed

Masonry Resources

Clay Brick Masonry
Concrete Masonry
Mortar & Grout
Reinforcing Steel
Sustainability & LEED
Wall System Comparisons


MAF Websites

​Find out more about Masonry
​Pre-Apprentice Programs by visiting:
www.MasonryEducation.org
Picture
Masonry Association of Florida, Inc. |PO Box 24474 , Fort Lauderdale, FL 33307
Copyright  ©  2017. All Rights Reserved.
Sitemap
  • News
  • Knowledge Base
  • FloridaMasonry.com