Are control joints required in CMU structural backup walls in double wythe cavity systems with brick veneer on the exterior, drywall on the interior and a drainage plane between the two wythes?
Quote from the Control Joint section of NCMA TEK 10-01A - “Because shrinkage cracks in concrete masonry are an aesthetic rather than a structural concern, control joints are typically only required in walls where shrinkage cracking may detract from the appearance or where water penetration
may occur.”

Control joints in the CMU wall are there to accommodate movement of the wall due primarily to shrinkage of the concrete block. Uncontrolled cracking, when visible, is unsightly and when exposed to wind driven rain may allow water to enter the wall and possibly the interior of the building. The control joints both hide the cracking for aesthetic reasons and concentrates the movement in a location (the control joint) where waterproofing can be easily applied to prevent water from entering through the joint into the structure. 

Double wythe cavity walls containing a drainage plane between the two wythes offer the unique feature of both visually covering the CMU backup wall and preventing wind driven rain from reaching the backup wall. As stated in TEK 10-01A this eliminates the two main reasons for incorporating control joints into the structural backup CMU wall. 

In making the determination to eliminate control joints in the structural masonry backup of a double wythe cavity wall it is important to ensure that the section of wall will indeed be neither visible or subject to exterior weather. Particularly in long sections of wall, the elimination of control joints in a single area of the wall may produce additional stress, and thus larger more pronounced cracks, in an adjacent section of the wall exposed to visual sight or weather.

Control joints may also have a structural purpose, thus elimination should not be done without the knowledge of the structural engineer for the project.
0 Comments



Leave a Reply.

    Authors:

    Picture
    Jerry Painter, FASTM
    352-378-7511
    painterjm@gmail.com 

    Picture
    Don Beers, PE, GC
    561-310-9902
    don@floridamasonry.com

    Categories

    All
    #5 Rebar
    Backer Rod
    Backup Wall
    Bar Hooks
    Block Strength
    Bond Beam
    Bond Breakers
    Brick
    Brick Veneer
    C129
    C90
    Cavity Wall
    Cell Size
    Cell Width
    Cmu
    Code Editions
    Code Requirements
    Codes
    Concrete Block
    Concrete Interlocking Pavers
    Concrete Pavers
    Construction Guidance
    Control Joint
    Control Joints
    Corner Attachments
    Cracking
    Crosswebs
    De-bonded Veneer
    Density
    Design Criteria
    Driveway
    Energy
    Energy Efficiency
    Energy Loss
    Envelope Leakage
    Expansion Joints
    FBC
    FBC 6th Edition
    FBC 7th Edition
    Filling Cells
    Fine Aggregate Grout
    Fire Rating
    Florida Building Code
    F''m
    Grouted Beam
    Grout Height
    Grouting
    Grouting Of Block Walls
    High Strength Masonry
    High-strength Masonry
    High Wind
    High Wind Construction
    HJR
    Horizontal Steel Spacing
    ICC 600
    ICC Code
    Infill
    In-plane
    Insulation
    Integral Waterproofing
    Interlocking Pavers
    Intermediate
    Intersecting Walls
    Job Requirements
    Jobsite
    Joint Reinforcement
    Light-weight
    Masonry
    Masonry Construction
    Masonry Details
    Masonry Insulation
    Masonry Websites
    Masonry Workmanship
    Max Bar Size
    Missile Impact
    Mortar
    Mortar Joints
    Net Area Strength
    Out-of-plane
    Perm
    Pnnl
    Psi
    Rebar
    Reinforcement
    Residential
    R Value
    Safety
    Setting Pavers
    Shear Walls
    Shrinkage
    Slip Joints
    Sound Insulation
    Sound Transmission
    Split-face Block
    STC Rating
    Sticky Stone
    Stucco
    Stucco Bonding
    Stucco Over Lath
    Table 2
    Thin Veneer
    Tie Beams
    TMS
    TMS 402/602
    Tyvek
    UL
    UL Labeling
    Vapor Barrier
    Vertical Steel
    Vertical Walls
    Videos
    Wall Bending
    Wall Design
    Wall Tolerances
    Water Intrusion
    Waterproofing
    Water Vapor
    Wind

    Archives

    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    October 2021
    August 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    October 2020
    September 2020
    August 2020
    July 2020
    May 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018

    RSS Feed

Masonry Resources

Clay Brick Masonry
Concrete Masonry
Mortar & Grout
Reinforcing Steel
Sustainability & LEED
Wall System Comparisons


MAF Websites

​Find out more about Masonry
​Pre-Apprentice Programs by visiting:
www.MasonryEducation.org
Picture
Masonry Association of Florida, Inc. |PO Box 24474 , Fort Lauderdale, FL 33307
Copyright  ©  2017. All Rights Reserved.
Sitemap
  • News
  • Knowledge Base
  • FloridaMasonry.com